One London Wall

Project: Cat A fit out

Location: Barbican, London

Client: One London Wall

Main Contractor: Collins Construction

Value: £610,000

Duration: 14 weeks

Description: Cat A fit out of the 10th, 9th and 4th floors. All distribution boards were replaced and new modular wiring installed on containment in the ceilings, feeding MDB’s and LCM’s. New lighting and lighting controls were fitted throughout the open plan floor areas with rondels installed at regular intervals, the rondels are illuminated using LED tape